So moved in over a month back and have been getting into the reno heavily the last few days.

Before I moved in:

Move in:

Now the changes are starting

(Above there is no power in my office yet so as you can see I ran the cords through the wall and same with my network cables πŸ˜›


Cleared off above wall need to remove this wall completely to move it up a few feet


Put up the door "Kinda" its bolted in but not fitted yet and that wall has to come down so… a little bit of a waste of time but meh haha


Sadly the wall goes into another so it will need to be cut out and modified before moved but might have to pay someone to do this

Need to still get the new outlets and my Cat6 keystones and stuff that were ordered a year back from NCIX but guess since they went under I will have to go elsewhere.

  • Outlets

  • Insulation

  • Drywall

  • Green Glue

  • Resilent chambers

  • Resilent clips

  • Green Calking

  • The Wall moved

Once above is done I will them create a floating desk on 3 walls 1 for builds and a corner desk for my main rig

RHR Crew

Big Update,

Well insulated a wall that is not getting upgraded with new outlets


From there my buddy Kevin came over and noticed our power in the basement was ummm fucked yah there is no nice way of saying it so he upgraded us with a new SUBPANEL!!!!!


He also removed all the doubled up breakers and is wiring the office with more outlets

now for the fun part… Goodbye crapy wall

All cleared out now its time to remove more walls but for now I go back to work.

Looks like it's all coming together. Getting a new place the way you want it always takes some time.

RHR Crew

Thanks, really looking forward to this being done and doing reviews again.

Also I'm sure my daughter will be happy when her room has power again hahaha

RHR Crew

New panel is done now


Time to get the router and modem wall done and snazzy maybe I'll setup a open air system here to unsure

Room is expanding even more now. There are now about 6 dedicated 15 amp quad plugins now and 6 recessed lights going in.

Next weekend the wall should go up then I hit the insulation all over then drywall and finishing πŸ™‚

RHR Crew

Back to work on the office finally again, we now have walls and some insulation and almost all the power is done πŸ˜ƒ

alt text

New wall is up but the following is now needed for the weekend:
Move the washer and dryer down
Move the dryer vent to a new location
Remove drywall that is already there
Wire up new lights all 6 of them LET THERE BE BETTER LIGHTING!!!
Put in new insulation and vapor barrier

alt text

Also my buddy fixed the surround around the ducting that will now be filled with soundproofing insulation and resonating chamber.

Was thinking carpet down but buddy has a ton of new gym thick foam mats for sale and tempted to use those for the office and laundry room and put a throw in the office as well.

Will be adding lots of soundproofing foam around all the top points and a wall when done, thinking maybe a couch to for videos.

PS now that I have 2 windows in there I think I will put a push pull large window fans in and do some in the office mining πŸ™‚

RHR Crew

A ton of work went on yesterday all electrical is now ran and ready for drywall even all 6 lights are prepped to be potted.
Installed a ton of insulation and even wired a few cat6 cables up in their boxes for when the wall is done. Still need to finish insulation on the roof and all the drywall, mud, sand and finishing plus the floor but its moving along at least.

Might get a sheet or 2 of drywall to seal the new wall so it does not cause a mess.

alt text

alt text

alt text

alt text

  • 7
    Posts
  • 584
    Views

Looks like your connection to Real Hardware Reviews Forums was lost, please wait while we try to reconnect.